|
The INTMINS April 1999 operations
schedule was done on the base of the MIR ground track long-term
prediction using the MIR's orbital elements status on 29/03/99.
|
The investigation of the time shift behaviour was began before 29/03/99 on the base of the different orbital elements determined (by KIAM RAN) 22/03/99, 25/03/99 and continued on the base of the orbital elements determined at 31/03/99, 5/04/99.