The plot of the geophysical regions' time-distribution
Date is shown along the X-axis, the UT - along the Y-axis.
In case of the one satellite investigation on the plot
the simulative geophysical regions in the spacecraft positions are
shown as a function of the UT.
The time (with 10-min step) is labeled by the region symbol.
In case of the multisatellite campaign investigation on the
summary plot for each satellite its own color and line are used to show
the time-intervals selected in accordance with campaign criteria.
In this case the name of each SC is shown by its color.
The moments of the orbit cross-sections with the simulative magnetopause &
boshock are shown by the "diamond" & "cross" symbols.